Sign in Subscribe

Auburn conservation board orders review of Lynch road erosion

Conservation · Meeting of August 12, 2026

Auburn conservation board orders outside review of road-project erosion after contractor skipped required filing. Chairman Michael Garland grilled J.H. Lynch Vice President Greg Lynch Jr. over the company's failure to file a notice of intent before rebuilding South Street and Church Street, both of which cross wetlands, saying "they breached the contract." A Department of Public Works representative conceded Lynch's erosion controls "were not 100 percent effective" after a nearly 4-inch rainstorm on July 30.

On a motion from Commissioner Ricky Arisme, amended by Commissioner Meghan Langley, the board voted unanimously to hire a consultant to assess wetland damage and recommend future erosion controls, with any fines against Lynch to wait for that report. The board also approved tree removal at 14 Riverside Drive and a wetland-delineation extension for 100 Millbury Street, and continued a Dunkin drive-through hearing at 481 Washington Street to August 26 pending a site visit.

In the full story:

  • Who Was There
  • Organizations And Documents Referenced
  • The complete report — 2,729 words

Source: the Conservation meeting of August 12, 2026, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to Worcester County News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Worcester County News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe