Douglas Panel Votes to Seek Voice in DPW Design
Douglas facilities panel presses for a seat at DPW building design talks after years of late-stage surprises.
Other Committee 2026-09-16 Part 2 · Meeting of September 16, 2026
Douglas facilities panel presses for a seat at DPW building design talks after years of late-stage surprises. The Building, Facilities and Construction Committee voted unanimously, pending Board of Selectmen approval, to name Margaret Bacon its representative at design meetings for the town's planned highway/DPW facility, with Carol Gogolinski as backup. Member Fred Fontaine, who has been coordinating with engineering firm Weston & Sampson since a 2021 feasibility study, said conceptual drawings are expected before October's meeting but declined to estimate cost, saying only "baby steps." Separately, Town Planner John Chabenau told the board a Green Communities contractor, Inovus, is seeking roughly $18,000 to install library LED lighting originally meant for the post office; staff later confirmed the roughly $23,000 in matching grant funds was never appropriated at town meeting, pushing the library project to a spring 2027 warrant.
Chabenau also told the board his role is limited to Green Communities updates: "It's really not productive or necessary for me to be here for the rest of the meeting."
In the full story:
- Who Was There
- Organizations And Documents Referenced
- The complete report — 2,585 words
Source: the Other Committee 2026-09-16 Part 2 meeting of September 16, 2026, reported from the official video recording and transcript.
Members read the rest of this story and every Worcester County meeting we cover, in full.
Become a memberAlready a member? Sign inA 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms
Share this story
Know someone in Worcester County who follows town government? Share Townbrief Worcester County: they can sign up free.