Douglas Board of Health approves $525,000 in budgets, grants South Street septic variances

DOUGLAS — March 30, 2026 — Douglas Board of Health approves $525,358 in fiscal year 2027 budgets and grants two septic setback variances at a heavily constrained South Street property. The board unanimously approved a general operating budget of $145,215 — covering health, public health nurse, and animal inspection wages and expenses — and a transfer station enterprise budget of $380,143, which is projected to be offset by roughly $350,143 in sticker revenue with a maximum $30,000 draw on retained earnings currently standing near $273,000. Engineer Mark Allen of Allen Engineering and Associates won approval for a 10-foot-to-7-foot property-line setback reduction and a well-to-wetlands variance at 30 South Street, describing the one-and-a-half-acre wetland-hemmed parcel as "the number one" toughest septic project in his 30-year career; the design calls for a three-foot-high raised mound leach field ringed by paver walls and a 40-mil polyethylene liner. The board also discussed pursuing a multi-year solid waste hauling contract to replace annual renewals, reviewed three landfill cap repair alternatives prepared by consultant Haskell — with Alternative 2 rated highest on effectiveness at lowest cost — and agreed to research eligibility for a state Reduce, Reuse, Repair micro-grant before its May 15 deadline, with 1,099 transfer station stickers sold to date in the new fiscal year.

Keep reading with a 14-day free trial

Subscribe to Worcester County News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Worcester County News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe