Douglas Water Commission Approves Over $16,000 in Abatements at May Meeting
DOUGLAS — May 12, 2026 — Douglas Water Commission grants more than $16,000 in water and sewer abatements at May 12 meeting. The commission — comprising Commissioners Kyle Loose, Colin Hare, and Bob Selby — approved two separate abatements totaling $13,344.29 for the Douglas public schools after a district representative demonstrated that a Neptune exception irrigation meter at the high school had been transmitting no data due to a disconnected wire splice between the meter and its radio, resulting in inflated sewer charges across multiple billing cycles. The school abatements covered a September 15, 2025 bill ($8,741.00) and a March 5, 2026 bill ($5,603.29), both passed on unanimous voice votes. A third abatement of $2,978.84 — the sewer portion only — was approved for a 78-year-old residential customer who sustained a billing spike after two toilets were found leaking. Separately, Loose reported that engineering estimates for the North Street tank project have reached approximately $5 million after adjustments, with grant applications in preparation targeting fall Town Meeting, and that Synagro has proposed a one-year biosolids contract renewal at $12.91 per gallon, up roughly 20 percent from the current $10.76 rate.
Keep reading with a 14-day free trial
Subscribe to Worcester County News to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news