Lunenburg Sewer Commission previews 5 percent rate hike ahead of Saturday Town Meeting
LUNENBURG — April 28, 2026 — Lunenburg Sewer Commission reviews 5 percent user-rate increase set for Town Meeting presentation Saturday. Vice Chairman Scott Dahl presided at the April 28 hybrid meeting, with Chairman and DPW Director Bill Bernard both absent, as staff member Andrew Valeri walked commissioners through a slide presentation destined for the Annual Town Meeting on May 2. The 5 percent increase on sewer user rates is driven by rising disposal costs, shrinking betterment revenues, and a halt to retained-earnings draws; the minimum quarterly charge is not increasing, a deliberate policy choice Valeri said is intended to protect elderly and lower-income ratepayers at a time when the town is also seeking a Proposition 2 1/2 override. Separately, the commission learned that a sewer stub extension at 5 Ramgren Road was awarded to low bidder Bob Proctor at $4,800, with work expected to begin the following week, and that a months-long search for a missing pressure-line stub at 100 Laurel Lane will move to exploratory excavation, with Commissioner Dan Proctor offering to dig test holes while his equipment is working nearby.
Keep reading with a 14-day free trial
Subscribe to Worcester County News to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news