Lunenburg Sewer Commission Approves Leak Waiver, Orders Pressure-Line Design for Laurel Lane

LUNENBURG — June 9, 2026 — Lunenburg Sewer Commission approves a $6,127 waiver and orders a pressure-line redesign at a troubled Laurel Lane address. The commission voted 5-0 at its June 9 meeting to forgive the sewer portion of a $6,260 bill at 1790 Massachusetts Avenue, where an underground leak ran undetected beneath a property trailer for roughly six weeks during the winter; the resident will be billed only for her normal minimum usage. On a separate matter, staff abandoned a $9,000-plus gravity sewer repair proposal for 100 Laurel Lane after a field probe confirmed the site lacks adequate pitch and that the originally proposed manhole connection would have required raising the road surface — instead, the commission directed staff to design a three-connection E1 grinder-pump pressure system serving 100 Laurel Lane, its accessory dwelling unit, and 104 Laurel Lane, with bid documents to follow. The meeting also surfaced a policy concern: staff said an independent review of the commission's sewer regulations found no clear authority to charge additional betterment fees when a single-family property converts to multi-family use, a gap members said could grow as state zoning changes drive more infill development, and staff said they will bring the question to town counsel.

Keep reading with a 14-day free trial

Subscribe to Worcester County News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Worcester County News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe